Tuesday, April 9, 2019

Chassis work continues - April 9, 2019

I've been working all week on the chassis.  With researching, and taking care to prep and paint the parts correctly, with the correct bolts/nuts, washers, all to install just as it came from the factory...it takes a lot of time.  Tony and I arrive at 7am and leave at 8 or 9pm everyday.  He's some progress through Tuesday, April 9, 2019:

Chassis installed: Rear, half shafts, shocks.

A closer look at the half shaft, shocks, etc.

Lining up the fuel tank.  Notice the anti-noise strip under the tank...glued to the tank vs the frame per review of a couple of original 1963 cars.

Tank and fuel neck is in and strapped down.

Rear leaf spring bolted and in place.  Painter grey with the black plastic liners.

Installing the bushings in the lower control arms with Andrew at Tony's Corvettes.

Andrew mentioned that the bushings went in rather easily...as these lower control arms were very straight.  Not typical, usually the control arms are slightly bent and makes it a challenge to get bot in...it only took about 5 min to get both lower control arms completed.